CASE STUDIES INDEPENDENT AUDIT IN PROGRESS

The numbers we put on a customer's electric bill, on the record.

Every Eco Kold install is documented by a certified technician. Independent field measurement is underway; verified results will be published once cleared. This is the running list.

Featured · Independent audit in progress

Independent field measurement is underway; verified results will be published once cleared.

We document every Eco Kold install with a certified technician and third-party measurement. As reports clear review, the featured results will appear here.

More from the field

Four more installations on the audit table.

Documentation in progress on these. The raw reports exist; we're cleaning them up for publication. Reach out if you want the source PDFs ahead of release.

Panama Viejo · 5-ton AC retrofitApril 6, 2025 · HCR 4242 vs R-22 · install report drafted
In documentation
Saybolt · Industrial laboratory coolingHCR 4040 retrofit · before/after measurement done · awaiting publication
In documentation
Canada Importer Site · HCR 4141 commercial ACTest install · audit pending
In progress
Panama March / April 2025 programMulti-site batch retrofit (8 units) · HCR 4242 + HCR 4141 · interim report internal
Internal review

Have an install you'd like documented? We share third-party audit costs with sites that agree to a public case study.

Propose a case study

Have a system running on R-22, R-410A, R-404A, or R-134a?

Send us the equipment make, model, and current refrigerant. We'll match the right Eco Kold blend, quote pricing, and connect you with a certified installer in your region, usually within one business day.

Request a Quote Reply within 1 business day